Hazardous Waste Regulation, B.C. Reg. 63/88
Section 34
Operational requirements
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 34 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) The owner of a secure building must
(a) at appropriate times during construction and installation inspect
(i) synthetic liners to ensure tight seams and joints and the absence of punctures, blisters or tears,
(ii) floors, walls, doors, hatches and roofs for defects, and
(iii) clay liners for imperfections (e.g. lenses, cracks, channels)
which would increase permeability,
(b) during operation inspect weekly and immediately after any catastrophic event all floors, walls, doors, hatches, roofs and drainage control facilities, for evidence of deterioration, malfunction, leaks or improper operation, and
(c) immediately repair or correct any defects or malfunctioning works as determined by any inspections specified in paragraphs (a) and (b) so as to maintain the integrity of all works.
(2) The owner of a secure building must carry out an approved monitoring program by
(a) establishing a groundwater monitoring system with a sufficient number of wells, installed at appropriate locations (upgradient and downgradient) and depths, to yield from the uppermost aquifer groundwater samples that
(i) represent the quality of groundwater that would not be affected by leakage, if any, from a secure building, and
(ii) represent the quality of groundwater that would be affected by leachate, if any, from a secure building,
(b) ensuring the quality of groundwater monitoring data by
(i) casing sampling wells with appropriate materials to ensure the integrity of the boreholes,
(ii) preventing contamination
(A) of any part of the well during construction, and
(B) from the surface during operation, and
(iii) implementing procedures for
(A) decontamination of sampling equipment,
(B) sample collection,
(C) sample preservation and shipment,
(D) sample custody, and
(E) analytical procedures and quality assurance,
(c) selecting indicator parameters (e.g. specific conductance, pH, total organic carbon) and chemical constituents for analysis of groundwater that
(i) provide a reliable indication of the quality of groundwater below the secure landfill from the perspective of human health hazards and environmental quality,
(ii) reflect the physical and chemical characteristics of the waste, and
(iii) provide a reliable indication of movement of any contaminant with groundwater flow,
(d) sampling groundwater sufficiently often to provide data that is representative of varying groundwater flow conditions, but in any case no less frequently than once every 3 months,
(e) measuring the groundwater surface elevation each time the groundwater is sampled, and
(f) reporting monitoring results at intervals specified by a director.
(3) The owner of a secure building must, as operations proceed, record in tabular and graphic form the exact location and type of hazardous waste in relation to one or more permanently secured datum points and keep this information available for inspection by an officer.
(4) The owner of a secure building must
(a) within 3 days after detecting any defects or malfunctioning works, notify a director, and
(b) within 3 days after receiving monitoring data indicating non-compliance with respect to groundwater conditions, notify a director.
Read the Hazardous Waste Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.