Energy Resource Road Regulation, B.C. Reg. 56/2013

Section 15

Limited maintenance

Cite as Energy Resource Road Regulation, B.C. Reg. 56/2013, s. 15 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

(1) If a road permit holder temporarily stops using the energy resource road to carry out a primary activity for a period anticipated to be greater than 6 months, the person is not required to perform the maintenance and undertake the modifications set out in section 12 but must ensure (a) the structural integrity of the road prism and clearing width are stable, and (b) the drainage systems of the road are functional to the extent necessary to ensure there is no material adverse effect on fish, fish habitat, water quality or quantity, wildlife or wildlife habitat. (2) A road permit holder referred to in subsection (1) must notify the regulator not more than 30 days after a stoppage referred to in that subsection, and the notice must specify all of the following: (a) the location of the road; (b) the road permit; (c) a contact name and contact information; (d) the projected duration of the stoppage. (3) A road permit holder referred to in subsection (1) must notify the regulator when the road permit holder resumes using the energy resource road.
Read the Energy Resource Road Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.