Processing Facility Regulation, B.C. Reg. 48/2021
Section 3
Application for processing facility permit
Cite as Processing Facility Regulation, B.C. Reg. 48/2021, s. 3 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
(1) An applicant for a processing facility permit must submit to the regulator an application that includes all of the following information and records respecting the proposed processing facility:
(a) a detailed project description;
(b) a construction schedule;
(c) a summary of the codes and standards for engineering design, siting, construction and operation that the applicant intends to adopt in addition to those adopted under section 2 [adopted codes and standards];
(d) preliminary engineering design information, plot plans and process flow diagrams;
(e) the design basis for the
(i) flaring, venting and relief systems, and
(ii) collection, storage, treatment and disposal systems for handling surface runoff and industrial waste water;
(f) if the applicant intends to construct a modular unit outside British Columbia,
(i) a description of the scope of the module, and
(ii) the construction plan for the module;
(g) the reports referred to in section 4 (4) [required reports].
(2) An applicant for a processing facility permit must ensure that qualified professionals prepare the information and records referred to in subsection (1) (c), (d) and (e).
Read the Processing Facility Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.