Processing Facility Regulation, B.C. Reg. 48/2021
Section 21
Venting and flaring
Cite as Processing Facility Regulation, B.C. Reg. 48/2021, s. 21 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
(1) Except as permitted by the processing facility permit, a processing facility permit holder must not
(a) vent gas from a processing facility unless the gas heating value, volume or flow rate is insufficient to support stable combustion, or
(b) flare gas from a processing facility unless flaring is required for emergency or maintenance purposes.
(2) If venting or flaring occurs, a processing facility permit holder must
(a) minimize the quantity of vented or flared gas and the duration of venting or flaring,
(b) ensure that,
(i) during normal operations, there are no visible emissions, and
(ii) during emergency or maintenance operations, emissions are visible for no more than 5 minutes in any 2-hour period, and
(c) ensure that emissions from vents or flares do not cause
(i) a material threat to life or health,
(ii) off-lease odours, or
(iii) injury to vegetation or wildlife.
(3) If the quantity of vented or flared gas exceeds or is likely to exceed 10 000 m3, a processing facility permit holder must
(a) notify the regulator
(i) at least 24 hours before a planned venting or flaring event, or
(ii) within 24 hours after an unplanned venting or flaring event begins, and
(b) give to the regulator, on request, information respecting the events.
(4) A processing facility permit holder must ensure that an unsupervised flare stack at a gas processing plant where continuous flaring will occur is
(a) equipped with a continuous monitoring device that monitors whether a flame is present, or
(b) inspected at least every 7 days to determine whether a flame is present.
(5) A processing facility permit holder must maintain records of inspections conducted under subsection (4) (b).
(6) A processing facility permit holder must ensure that flare and incinerator systems installed after January 1, 2025, are designed for a 98% carbon conversion efficiency.
Read the Processing Facility Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.