Groundwater Protection Regulation, B.C. Reg. 39/2016
Schedule 1
Schedule 1
Cite as Groundwater Protection Regulation, B.C. Reg. 39/2016, Schedule 1 · last amended December 1, 2022 · read from BC Laws on November 17, 2026
The text
Schedule 1
[am. B.C. Reg. 75/2021, s. 3.] Information in Artesian Flow Management Reports 1 A report by a professional in respect of artesian flow management required under section 67 [report on artesian flow management] of this regulation must include
(a) the following information relating to the owner, location and identification of the well:
(i) the name, mailing address, telephone number and, if available, the email address of the owner of the well;
(ii) the property on which the well is located, described by its site address, legal description or parcel identifier number (PID);
(iii) either
(A) the universal transverse mercator (UTM) zone and the UTM coordinates of the well recorded to the nearest metre, or
(B) the latitude and longitude of the well recorded in decimal degrees to at least 5 decimal places, or recorded in degrees, minutes and seconds with the seconds recorded to at least 2 decimal places;
(iv) if a well identification plate is attached to the well, the well identification number,
(b) the following information relating to actions taken to mitigate or remediate damage caused by artesian flow:
(i) a description of the assessment of artesian flow, including rate of flow, artesian pressure, site conditions and visible impacts;
(ii) a description of the construction of the well and the observed state of the artesian flow in respect of the well, including a scaled drawing that shows the construction and the observed state;
(iii) in respect of any actions taken to attempt to stop or bring the artesian flow under control, or remediate any damage caused by the artesian flow, a description of the following:
(A) any actions taken by the professional or, to the knowledge of the professional, by another person;
(B) the timeline for the actions;
(C) if known, the name and contact information of another person who took the actions;
(D) any observations, or proof, of the actions taken by another person under clause (A);
(E) any material, including sealant, added into the flowing artesian well;
(F) the reasons for the failure of the attempts to stop or bring the artesian flow under control,
(c) an evaluation by the professional in respect of the following:
(i) a description of the proposed manner of managing the artesian flow, including the following:
(A) the exceptional circumstances that make it not practicable to stop or bring the artesian flow under control under section 52 (1) (a) or (b) [controlling artesian flow during construction] of the Act;
(B) the method by which the flow of water will be prevented from flowing back into the well;
(C) if the well will be altered, modified or configured differently, a description of what is proposed and a scaled drawing of the well;
(D) the anticipated work plan and timeline for implementation;
(E) the estimated reduction of artesian flow;
(F) options, if any, for managing the artesian flow other than the proposed manner;
(G) any potential threats to property, public safety or the environment that may be posed by the proposed manner;
(H) any other potential impacts that may be caused by the proposed manner, including to any public or private lands or activities, to infrastructure, to stream water, to any aquifer, to other water users or holders of water rights or to wildlife, fisheries, habitats or other ecosystems;
(I) options, if any, for potential remediation of any adverse impacts that may be caused by the proposed manner, such as those described in clauses (G) and (H);
(J) the estimated cost of managing the artesian flow in accordance with the proposed manner, including maintenance and monitoring costs that may be anticipated;
(K) the estimated cost of stopping or bringing the artesian flow under control;
(ii) any conclusions as to whether the proposed manner of managing the artesian flow
(A) would be more suitable than stopping or bringing the artesian flow under control, and
(B) would not pose a threat to property, public safety or the environment;
(iii) the reasons or basis for the conclusions under subparagraph (ii), including the following:
(A) an evaluation of the risks and consequences of the proposed manner of managing the artesian flow as compared to other options;
(B) an evaluation of the likelihood that the proposed manner of managing the artesian flow will satisfy the requirements of section 52 (6) of the Act, and
(d) the following information:
(i) the name and business contact information of the professional, including business name, if any, address, telephone number and, if available, email address and fax number;
(ii) a summary of the professional's experience with controlling or managing artesian flow. 2 Section 1 of this Schedule does not limit any other provision of this regulation that may require the inclusion of information in a report in respect of artesian flow management.
Read the Groundwater Protection Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.