Groundwater Protection Regulation, B.C. Reg. 39/2016
Section 69
Deactivating or decommissioning wells — general
Cite as Groundwater Protection Regulation, B.C. Reg. 39/2016, s. 69 · last amended December 1, 2022 · read from BC Laws on November 17, 2026
The text
(1) Subject to subsection (3), for the purposes of section 56 (2) (a) [decommissioning or deactivating well] of the Act, the prescribed period for a well to be considered to be not in service is 5 years.
(2) Subject to subsection (3), for the purposes of section 56 (4) of the Act, the prescribed period for a deactivated well to be considered to be not in service is 5 years.
(3) The prescribed periods set out in subsections (1) and (2) do not apply in the case of a flowing artesian well that is managed in accordance with section 52 (6) [controlling artesian flow during construction] or 53 (3) [controlling flowing artesian well] of the Act.
(4) If a flowing artesian well is managed in accordance with section 52 (6) or 53 (3) of the Act, the requirements of this Part do not apply in respect of the well until it is possible to deactivate or decommission the well in accordance with the recommendations of a professional, as accepted by an engineer.
Read the Groundwater Protection Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.