Water Sustainability Regulation, B.C. Reg. 36/2016

Section 32.2

Exemption — mid-volume construction dewatering

Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 32.2 · last amended May 11, 2026 · read from BC Laws on November 17, 2026

The text

(1) A person is exempt from the requirement under section 6 (1) [use of water] of the Act to hold an authorization for the diversion of groundwater for construction dewatering if all of the following conditions are met: (a) construction dewatering activities are designed and performed, or directly supervised, by a registrant within the meaning of the Professional Governance Act who has competence in the field of hydrogeology or geotechnical engineering; (b) on any day within the diversion period, no more than 1 000 m3 of groundwater are diverted from the aquifer, whether from a single diversion point or multiple diversion points; (c) the conditions set out in section 32.1 (2) (b) to (e) of this regulation; (d) the registrant referred to in paragraph (a) of this subsection prepares a record of all of the following: (i) the dates on which the diversion period begins and ends; (ii) the location description in relation to the aquifer from which groundwater is diverted and each point of diversion and discharge; (iii) the volume of groundwater diverted each day; (iv) details of the professional's assessment with respect to the conditions described in section 32.1 (2) (c) and (e). (2) If the professional referred to in subsection (1) (a) is not competent to assess the risk of harm to the environment for the purposes of the condition described in section 32.1 (2) (e), (a) the risk of harm to the environment must be assessed by a registrant within the meaning of the Professional Governance Act who has competence in the field of applied biology, and (b) details of the assessment must be included in the record prepared under subsection (1) (d) of this section. (3) A person who is exempt under this section must keep the record prepared under subsection (1) (d) for at least 3 years after the end of the diversion period.
Read the Water Sustainability Regulation on BC Laws ↗

Made under Water Sustainability Act, SBC 2014, c. 15.