Water Sustainability Regulation, B.C. Reg. 36/2016
Section 32.1
Exemption — low-volume construction dewatering
Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 32.1 · last amended May 11, 2026 · read from BC Laws on November 17, 2026
The text
(1) In this section and sections 32.2 and 32.3:
“construction dewatering” means removing or controlling excess groundwater from a single aquifer for the purpose of facilitating construction activities, including preventing floods and maintaining safety;
“diversion period” means the period that begins on the first day, and ends on the last day, that groundwater is diverted from an aquifer for the purposes of construction dewatering.
(2) A person is exempt from the requirement under section 6 (1) [use of water] of the Act to hold an authorization for the diversion of groundwater for construction dewatering if all of the following conditions are met:
(a) on any day within the diversion period, no more than 300 m3 of groundwater are diverted from the aquifer, whether from a single diversion point or multiple diversion points;
(b) the diversion period does not exceed 24 months;
(c) the water supply and works of persons who are lawfully diverting or using water under the Act will not be adversely affected by the diversion;
(d) there is no use of the groundwater for a water use purpose between the time the groundwater is diverted and the time the groundwater is discharged;
(e) groundwater is diverted and discharged without causing a significant risk of harm to public safety, the environment, land or other property.
Read the Water Sustainability Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.