Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 23.69.3
Flow piping systems — other requirements
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 23.69.3 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) If the pressure of a flow piping system at the worksite may exceed 2 000 kPa (290 psi) during well stimulation and similar operations, the employer must ensure that
(a) those operations of the flow piping system are conducted by remote control,
(b) unauthorized workers do not enter the area between the point of discharge and the wellhead, and
(c) before the operations are started, warning signs are posted in the area of the operations stating "DANGER, NO UNAUTHORIZED WORKERS ALLOWED IN THIS AREA" or other similar language.
(2) If the pressure of a flow piping system at the worksite may exceed 3 000 kPa (435 psi), the employer must ensure that
(a) the flow piping system connections are welded or flanged or are hammer unions, and
(b) if the only connection on the wellhead is a threaded connection that is integral to the wellhead, the component parts of that threaded connection are compatible with each other.
(3) The employer must ensure that each flow piping system at the worksite is completely depressurized before a leak in a connection or fitting in the flow piping system is corrected.
(4) The employer must ensure that a person does not hammer on a pressurized flow piping system at the worksite.
(5) If workers are using liquefied gas for well stimulation, the employer must ensure that the unit that supplies the liquefied gas and the unit that pumps the liquefied gas are positioned so that the valve controls of each of those units are on the sides of each of those units that are opposite from the piping that supplies the liquefied gas to the well.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.