Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 23.58

Drill pipes, collars and tubing

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 23.58 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

(1) Whenever drill pipes, drill collars or tubing are racked in a derrick, provision must be made for the complete drainage of any fluids or gases in the stands. (2) Before drill pipe, drill collar, tubing or casing is run in a well bore, it must be free from ice plugs or other obstructions. (3) Except while being moved, drill pipes, collars, tubing, casing and rods racked in a derrick must be secured at the top end by means of tieback ropes or equivalent devices to prevent them from falling out of or across the derrick.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.