Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 22.6

Notice of project

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 22.6 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

(1) No later than 30 days before commencing an underground project, written notification of the project must be given to the Board by the owner or another person engaged by the owner to be the prime contractor, except that if there is more than one prime contractor employed on the project the notice must be given by the owner. (2) The notification must include (a) the name of the project, (b) the address or location of the project referenced to the nearest town and public highway, (c) the name and address of the owner and of any other person engaged to be the prime contractor, and of the bonding company, if appropriate, (d) the name of the person in charge of the project, (e) a brief description of the project including (i) the type of underground working, (ii) the mining method, (iii) the type, number of units, and engine horsepower (watts) of the mining equipment, (iv) the starting date and approximate duration of the project, (v) the approximate peak labour force, and (vi) the proposed hours of work, (f) the details of proposed temporary or permanent ground support, including the proposed timing of such support, and whether the owner or another person engaged to be the prime contractor will be responsible for its design and installation, (g) the plans, drawings and fan specifications for the ventilation systems that will be used during construction, and (h) a report produced by a professional engineer or professional geoscientist that provides (i) a description of the geological hazards associated with the work, (ii) drawings showing profiles, transverse sections and plans for the proposed underground workings, including the potential for encountering gassy ground, explosive dusts, rock falls, running ground or rock bursts, and (iii) a detailed statement from the owner or another person engaged to be the prime contractor as to how geological hazards will be dealt with. (3) Any hazards discovered during the work which were not included in the report required by subsection (2) (h) must be reported immediately to the Board.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.