Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 22.16
Prior approval
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 22.16 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) The design for an underground working ventilation system must have the prior written approval of the Board before installation commences.
(2) The design submitted to the Board must include
(a) the dimensions of the underground working,
(b) a list of the equipment proposed for use underground and the air flow necessary for each internal combustion engine,
(c) calculations of the system air flow requirements and pressures to be developed in the system,
(d) ductwork dimensions and specifications,
(e) the make, model, horsepower, blade settings and performance curves or tables for all fans,
(f) detailed drawings of any other devices to be installed in the ventilation system,
(g) a cross section of the portal, showing the main exhaust located so that exhausted air will not come back to the portal,
(h) the altitude of the portal,
(i) a statement of air contaminant sources expected and proposed testing points and frequency of tests, and
(j) a schedule of hours of work.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.