Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.60
General requirements
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.60 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) Concrete pre-stressing and post-tensioning operations must be done according to the specifications and instructions of a professional engineer, and a copy of such information must be available on site while the work is being done.
(2) Stressing operations must be carried out under the direction of a qualified supervisor.
(3) Workers involved in pre-stressing or post-tensioning must be instructed in and follow safe work procedures.
(4) Appropriate eye protection must be worn by all workers involved in grouting, stressing and cable trimming operations.
(5) Tendons, including bars, strands and wires, used for tensioning purposes must be protected against physical damage and corrosion during handling, transportation and storage.
(6) Strand couplers must not be reused until they have been inspected by a qualified person and determined to be safe for reuse.
(7) Welding, burning or other work must not be permitted on any surface where strands have been strung or tensioned unless proper care is taken to protect the strands from sparks or other heat sources and from stray electric currents.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.