Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.5
Temporary floors
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.5 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) During the erection of a building or structure of skeleton construction, a temporary floor, decking or formwork must be installed at the main working level where work is being done.
(2) If compliance with subsection (1) is not practicable, a temporary floor or other effective means of protection must be installed not more than two levels or 8 m (25 ft) below the main working level.
(3) Subsections (1) and (2) do not apply during the initial connection of structural members where it is not practicable to provide a floor or decking.
(4) There must be a safe means of access and egress to each main working level referred to in subsection (1).
(5) A stairway comprised of at least framing, treads and a handrail must be provided to each floor level before construction of the next floor or deck surface is undertaken, and the treads on the stairway must not create a tripping or slipping hazard.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.