Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.17
Worksite-specific plans required for specified formwork
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.17 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) The employer must ensure that worksite-specific plans are prepared for the following types of formwork and any associated falsework or reshoring:
(a) flyforms;
(b) ganged forms;
(c) jump forms;
(d) vertical slip forms;
(e) formwork over 4 m (13 ft) in height;
(f) suspended forms for beams, slabs, stairs and landings;
(g) single-sided, battered or inclined forms over 2 m (6.5 ft) in height;
(h) cantilever forms;
(i) bridge deck forms;
(j) shaft lining forms;
(k) tunnel lining forms;
(l) formwork into which concrete will be pumped through an injection port below the upper concrete surface;
(m) formwork over 3 m (10 ft) in height into which self-consolidating concrete will be placed;
(n) formwork designated by the designer of the structure.
(2) The employer must ensure that a professional engineer certifies the following in accordance with section 20.18:
(a) worksite-specific plans;
(b) any changes to worksite-specific plans.
(3) The employer must ensure that certified worksite-specific plans are available at the worksite during the erection, use and dismantling of formwork, falsework and reshoring.
(4) The employer must ensure that any changes to certified worksite-specific plans are available at the worksite
(a) as soon as practicable, and
(b) before the inspection required for placement of concrete or other intended loading of formwork, falsework and reshoring.
(5) The employer must ensure that formwork, falsework and reshoring are erected, used and, if applicable, dismantled in accordance with up-to-date certified worksite-specific plans.
Read the Occupational Health and Safety Regulation on BC Laws ↗