Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 20.1

Definitions

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.1 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

In this Part: “adjacent to an excavation” means within a distance less than or equal to the overall depth of the excavation, measured from a vertical line through the toe of the excavation face; “application drawings”, also known as erection drawings, means drawings that contain the information necessary for the erection, use and dismantling of formwork, falsework, reshoring and associated components and equipment of the formwork, falsework and reshoring; “asbestos-containing material” has the same meaning as in section 6.1; “construction project” means any erection, alteration, repair, dismantling, demolition, structural or routine maintenance, painting, land clearing, earth moving, grading, excavating, trenching, digging, boring, drilling, blasting, concreting, the installation of any machinery or any other work deemed to be construction by the Board; “demolition” means tearing down, destruction, breakup, razing or removal of the whole or part of a building or structure, or of free standing machinery or equipment that is directly related to the function of the structure; “excavation” means any cut, cavity, trench or depression in the earth's surface resulting from rock or soil removal; “falsework” means a temporary support structure used to support loads during a construction project; “fill” means any soil or other loose material that is constructed to form an embankment or a part of the foundation of a structure or improvement; “formwork” means a temporary support system used to contain cast-in-place concrete during a construction project, but does not include falsework; “reshoring” means a temporary support system used to support a slab or other structure and withstand loads during a construction project after formwork and falsework have been removed; “stockpile” means any soil or other loose material that is placed in an area for storage but that is not intended to function as fill; “tilt-up construction” means a system of building construction in which concrete wall panels are placed in position in the permanent structure and temporarily braced or supported; “trench” means an excavation less than 3.7 m (12 ft) wide at the bottom, over 1.2 m (4 ft) deep, and of any length.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.