Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 14.84.1

Overlapping operating zones

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 14.84.1 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

(1) In this section: “operating zone” means, (a) in the case of a tower crane, the complete circular area covered by the swing of the tower crane's jib as it rotates, and (b) in the case of any other equipment, the area covered by the swing or movement of the equipment; “overlapping operating zone” means the area where the operating zone of a tower crane intersects the operating zone of another tower crane or other piece of equipment. (2) If practicable, an employer must ensure that a tower crane is erected to avoid creating an overlapping operating zone. (3) If the operating zone of a tower crane overlaps the operating zone of another tower crane, the following procedures apply: (a) the cranes must be erected and maintained so that the lowest point of any component of the higher crane is at least 3 m (10 ft.) above the highest component of the lower crane that crosses into the overlapping operating zone; (b) the boundaries of the overlapping operating zone must be marked so the boundaries are visible to the operators of all the affected cranes; (c) any load suspended by the higher crane must be positioned at a location that ensures at least 3 m (10 ft.) lateral clearance between it and an operator's cab on the jib of the lower crane; (c.1) if practicable, each crane must be equipped with and operated under the control of a zone-limiting device with anti-collision control; (d) written operating procedures in accordance with subsection (4) must be developed and implemented to coordinate lifting tasks in the overlapping operating zone to prevent contact between a component or suspended load of one crane and a component or suspended load of another crane. (4) The procedures required by subsection (3) (d) must do the following: (a) minimize the time each crane spends in the overlapping operating zone; (b) establish that the lower crane has priority for working in the overlapping operating zone; (c) establish that the operator of the higher crane requires temporary permission from the operator of the lower crane for each lifting sequence in the overlapping operating zone; (d) establish a means and protocol for communication between the operators of the cranes when a crane operates in the overlapping operating zone, including a requirement for the operator of the higher crane to contact the operator of the lower crane before the higher crane enters the zone; (e) establish that, when the lower crane is being operated or when a person is on the lower crane, the higher crane will not pass a load over the lower crane unless (i) the activity meets one or both of the following criteria: (A) the higher crane is being used to erect, service or dismantle the lower crane; (B) there is a minimum clearance of 18 m (60 ft.) between the underside of the jib of the higher crane and the highest point on the lower crane that is within the tip radius of the higher crane, and (ii) written operating procedures for the activity are developed and implemented to ensure the safety of workers. (5) If the operating zone of a tower crane overlaps the operating zone of another piece of equipment with a reach capable of interfering with the movement of the crane or hoist, or the load being lifted, (a) written operating procedures must be developed and implemented to coordinate lifting tasks in the overlapping operating zone to prevent contact between a component or suspended load of the tower crane and a component or suspended load of the other equipment, and (b) the boundaries of the overlapping operating zone must be marked so the boundaries are visible to the operators of all affected cranes and equipment.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.