Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 14.55

Uptravel limit

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 14.55 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

(1) A bridge, gantry or other overhead travelling crane must have a device which will prevent hook travel beyond the safe upper limit at all design hoist speeds. (2) The device required by subsection (1) must be tested at the beginning of each shift.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.