(1) This section applies to
(a) a bridge crane, gantry crane or overhead travelling crane that was installed after January 1, 1999, and
(b) a crane referred to in paragraph (a) or its runway that has been reinstalled, modified or rebuilt.
(1.1) The following tests must be performed before the equipment described in subsection (1) is used for the first time after it has been installed, reinstalled, modified or rebuilt, as applicable:
(a) all crane motions, holding brakes and travel brakes must be tested to meet the manufacturer's specifications and the requirements of the applicable design or safety standard for when the hook is carrying a load at rated capacity;
(b) all circuits, controls, interlocks and sequences of operation of the equipment must be tested to ensure they are functioning properly;
(c) all crane motions, holding brakes and travel brakes must be tested to prove the crane's ability to safely handle a load of 125% of the crane's rated capacity;
(d) all limit switches, brakes and other protective devices must be tested to ensure they function properly when the crane is carrying a load of 100% of the rated capacity;
(e) structural deflection must be measured with a load of 100% of the rated capacity and must not exceed the allowable deflection specified by the applicable design standard;
(f) the load must be travelled over the full length of the bridge and trolley runways during the load tests at 100% and 125% of rated capacity, and only the parts of runways that have been successfully load tested may be placed into service.
(2) A record of all load tests must be included in the equipment record system giving details of the tests and verification of the loads used, and be signed by the person conducting the tests.
(3) A replacement crane or hoist to be installed on an existing runway may be load tested in the manufacturer's facility and installed on the existing runway provided that the rated capacity of the replacement crane or hoist and the loads imposed on the runway by the replacement crane or hoist are equal to or less than the previously tested load rating for the runway.
(4) In the circumstances set out in subsection (3), the existing runway is not required to be load tested as required in subsection (1.1) unless the runway has been modified since it was previously load tested.
Read the Occupational Health and Safety Regulation on BC Laws ↗