Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 14.46

Vertical load line

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 14.46 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

The load line above the load hook or the load block of a crane or hoist must be kept vertical when lifting a load in order to prevent side loading of the crane or the load swinging.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.