Drilling and Production Regulation, B.C. Reg. 282/2010
Section 74
Measurement of fluids injected
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 74 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
A well permit holder must ensure that the quantity and rate of water, gas, air or any other fluid injected through a well to an underground formation is metered and that the injection pressure at the wellhead is measured.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.