Drilling and Production Regulation, B.C. Reg. 282/2010
Section 73
Reservoir pressure measurements
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 73 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) Subject to subsection (5), a well permit holder must ensure that the static bottom hole pressure of each completed zone of each of the permit holder's oil, gas, disposal or injection wells, and for any water source well accessing deep groundwater, is measured before initial oil, gas or water production, disposal or injection.
(2) Subject to subsection (6), a well permit holder must ensure that the static bottom hole pressure of each of the permit holder's producing pools, observation wells and water source wells accessing deep groundwater is measured once every calendar year.
(3) A well permit holder must report the following measurements to the regulator within 60 days of the date the measurements were taken:
(a) all static bottom hole pressures and temperatures and the duration of the resulting shut-in period;
(b) all other pressures measured using downhole recorders.
(4) A well permit holder must ensure that, when static bottom hole pressures and temperatures are measured, the surveyed wells remain shut-in until the reservoir pressure has been attained in the well bore or until sufficient data are available to permit the calculation of the reservoir pressure and, in the latter case, details of the reservoir pressure calculations are included in the report required under subsection (3).
(5) Subsection (1) does not apply with respect to a well completed in an unconventional zone listed in Schedule 2 if the regulator has released, under section 17 of the Energy Resource Activities General Regulation, well reports and well data that include a static bottom hole pressure measurement from the same unconventional zone within a 4 km radius measured from the wellhead of the well.
(6) Subsection (2) does not apply with respect to a well completed in an unconventional zone listed in Schedule 2.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.