Drilling and Production Regulation, B.C. Reg. 282/2010
Section 54
Daily oil allowable
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 54 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) In this section, “well depth” means the true vertical depth, in metres, of the lowest producing perforation or open hole section in a zone.
(1.1) This section does not apply to production from wells in unconventional zones listed in Schedule 2.
(2) The UDOA for an oil well, expressed in m3/day and rounded to one decimal place, is
(a) 10.0, if the well depth is less than 1 000 metres,
(b) the well depth of the well divided by 100, if the well depth is equal to or greater than 1 000 metres,
(c) as specified in the well permit, or
(d) as specified by an official.
(3) For oil wells that are part of a special project under section 75 of the Act and have been assigned a project UDOA, the project UDOA may be applied to the entire project area as though it were a single well.
(4) The gas-oil ratio adjustment factor for the purposes of subsection (6) is the factor calculated in accordance with the following formula, rounded to the second decimal place: FGOR = 177.3
GOR + 0.0257 x S where FGOR = the gas-oil ratio adjustment factor; GOR = net calculated gas-oil ratio (m3/m3); S = average separator pressure (kPa).
(5) A calculation under subsection (4) must be made in accordance with the following:
(a) the data used to make the calculation must be obtained from the last calendar month during which the oil well produced;
(b) for a gas reinjection project, the net calculated gas-oil ratio must be calculated using the net produced gas;
(c) the average separator pressure is
(i) for a single well, the average separator pressure for the month,
(ii) if stage separation is used, the average separator pressure of the lowest pressure stage for the month,
(iii) if a project UDOA has been designated for a group of wells, the average separator pressure for the month for the group of wells, weighted by the volume of oil produced, and
(iv) 400 kPa if no separator pressure is reported.
(6) The DOA of an oil well or a group of oil wells that have been designated a project UDOA under section 75 of the Act is: DOA = UDOA x FGOR x FOTP where DOA = the daily oil allowable in m3/day; UDOA = the unadjusted daily oil allowable in m3/day; FGOR = the gas-oil ratio adjustment factor calculated in accordance with subsection (3); FOTP = the off-target penalty factor determined under section 6 (4).
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.