Drilling and Production Regulation, B.C. Reg. 282/2010

Section 53

Measurements

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 53 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

A permit holder must ensure all of the following: (a) that the measurement equipment for each well, facility or gathering system for which the permit holder is responsible are sufficient to determine the actual production of each product from (i) each zone in a well, (ii) each product stream used for reporting purposes at a facility, and (iii) any fluid injection or pressure measurement required by this Part; (b) that the equipment and methods associated with the measurement of fluids are adequate for (i) the management of wells, pipelines, facilities and reservoirs, (ii) the quantification of waste discharges, (iii) production accounting purposes, and (iv) the assessment of royalties under the Petroleum and Natural Gas Royalty and Freehold Production Tax Regulation; (c) if quantities of energy resources or carbon dioxide are not metered due to the failure of a meter, chart recorder or quantity device, that an engineering estimate of all un-metered production from the well or facility is included in the quantity computation for the reporting period for the meter, chart recorder or other quantity device; (d) if a quantity error is apparent or discovered, that the quantity error and the source of the quantity error are rectified immediately and a report of the corrected quantity for the period during which the quantity was incorrect is submitted by the next reporting cycle; (e) if energy resources, carbon dioxide or water are produced from or injected into a well or facility, that (i) the meter is maintained in good operating condition, and (ii) the meter is suitably safeguarded from weather and from interference by unauthorized persons; (f) if energy resources, carbon dioxide or water are produced from or injected into a well or facility and there is a bypass around a meter, that valves are installed that, when closed, will effectively stop all flow through the bypass; (g) if energy resources, carbon dioxide or water are produced from or injected into a well or facility and a bypass around a meter is opened or if, for any other reason, the full production stream does not reach the meter, that a suitable entry is made on the meter chart or on the recordkeeping notations in the electronic flow measurement (EFM) system.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.