Drilling and Production Regulation, B.C. Reg. 282/2010

Section 42

Flaring limits

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 42 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) A permit holder must ensure that the duration of flaring and the quantity of gas that is flared is minimized. (2) Subject to subsections (3) and (5), a permit holder must not flare gas unless flaring is required for emergency purposes or for drilling operations. (3) A well permit holder may flare gas at a well if (a) flaring is required for a workover or maintenance and the cumulative quantity of gas flared does not exceed 50 000 m3 in one year, or (b) permission to flare is included in the well permit. (4) Repealed. [B.C. Reg. 159/2015, s. 10 (b).] (5) A facility permit holder may flare gas at a facility if (a) flaring is required for maintenance purposes, or (b) permission to flare is included in the facility permit.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.