Drilling and Production Regulation, B.C. Reg. 282/2010
Section 41.1
Leak detection and repair
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 41.1 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) In this section:
“comprehensive survey” means a survey to detect leaks using one or both of the following methods:
(a) an organic vapour analyzer that is
(i) capable of detecting natural gas concentrations of 500 parts per million, and
(ii) operated in accordance with United States Environmental Protection Agency Method 21 — Determination of Volatile Organic Compound Leaks;
(b) a gas imaging camera that is
(i) capable under laboratory conditions of detecting, at a distance of 3 metres, pure methane emitted at a rate of 1 gram per hour, and
(ii) operated by individuals who are competent in the operation of the camera;
“screening survey” means a survey to detect leaks using one or both of the following methods:
(a) a soap solution bubble test;
(b) the senses of hearing, sight and smell;
“water source well” has the same meaning as in section 1 of the Petroleum and Natural Gas Act.
(2) Subject to subsections (7) and (9), a facility permit holder must, each calendar year, carry out at least the following surveys of the facility, including, without limitation, any pneumatic devices at the facility:
(a) the number of comprehensive surveys determined in accordance with subsection (3), if the facility is one of the following:
(i) a gas processing plant;
(ii) a compressor station;
(iii) a battery, other than a satellite battery;
(iv) a processing battery;
(v) a natural gas liquid fractionation facility;
(vi) a compressor dehydrator facility;
(b) one comprehensive survey, if the facility is one of the following and is pressurized 91 days or more in the calendar year:
(i) an injection or disposal facility that processes or uses natural gas;
(ii) a tank terminal that processes or uses natural gas;
(iii) a pump station that processes or uses natural gas;
(iv) a satellite battery;
(v) a gas dehydrator facility;
(vi) a gas sales meter facility.
(c) Repealed. [B.C. Reg. 256/2024, App. 1, s. 4 (a) (iii).]
(3) The number of comprehensive surveys of a facility referred to in subsection (2) (a) required in a calendar year is the number set out in column 2 of the following table opposite the number of days the facility is pressurized in the calendar year set out in column 1: Column 1
Days pressurized
per calendar year Column 2
Surveys required
per calendar year 0 – 30 0 31 – 90 1 91 – 181 2 182 – 272 3 273 or more 4
(4) The facility permit holder of a facility referred to in subsection (2) must
(a) maintain a record of the number of days that the facility was pressurized in each calendar year, and
(b) submit the record to the regulator by March 31 of the calendar year after the calendar year to which the record relates.
(5) Subject to subsections (7) and (9), the well permit holder of a well, other than a water source well, a water injection well or a water disposal well, that is pressurized 91 days or more in a calendar year must carry out at least the following surveys of the well in the calendar year:
(a) one comprehensive survey, if the well
(i) has a production tank, or
(ii) is producing from an unconventional zone listed in Schedule 2;
(b) in any other case, one screening survey.
(5.1) This subsection and subsection (5) are repealed on December 31, 2029.
(5.2) Beginning on January 1, 2030, a well permit holder of an active well, other than a water source well, a water injection well or a water disposal well, that is pressurized 91 days or more in a calendar year must carry out at least one comprehensive survey of the well per calendar year.
(5.3) A well permit holder of an inactive well, other than a water source well, a water injection well or a water disposal well, must carry out at least one screening survey of the well per calendar year.
(6) Subject to subsections (7) and (9), a survey required under this section must be carried out no sooner than the following interval after the previous required survey:
(a) in the case of a facility described in subsection (2) (a), 60 days;
(b) in the case of a facility described in subsection (2) (b) or a well described in subsection (5) (a) or (b), 9 months.
(7) A permit holder who carries out a comprehensive survey of a facility under subsection (2) (a) or (b) or a well under subsection (5) (a) must at the same time carry out a comprehensive survey of each other facility and well of the permit holder that is located at the same site.
(7.1) Beginning on January 1, 2030, a permit holder who carries out a comprehensive survey of a well under subsection (5.2) must at the same time carry out a comprehensive survey of each other facility and well of the permit holder that is located at the same site.
(8) Repealed. [B.C. Reg. 256/2024, App. 1, s. 4 (h).]
(9) A requirement for a permit holder to carry out a screening survey of a well under this section is met if the permit holder carries out a comprehensive survey of the well.
(10) If a leak is detected at a facility or well during a comprehensive survey, the permit holder of the facility or well must quantify the leak rate.
(11) Repealed. [B.C. Reg. 256/2024, App. 1, s. 4 (k).]
(12) A facility permit holder must
(a) repair a leak detected at a facility during a survey required under this section as follows:
(i) if the repair does not require equipment to be shut down, within 30 days of detection;
(ii) if the repair requires equipment to be shut down, as soon as practicable, but no later than the next turnaround for the facility, and
(b) if the leak is repaired more than 30 days after detection, maintain, for at least 2 years from the date of the repair, a record of the reasons for the repair timeline.
(13) A well permit holder must repair a leak detected at a well or a facility associated with a well during a survey required under this section within 30 days of detection.
(14) A permit holder must
(a) prepare a leak detection and repair report for each survey carried out during a calendar year of a well or facility of the permit holder, and
(b) submit the report to the regulator by March 31 of the calendar year after the calendar year to which the report relates.
(15) A leak detection and repair report must include the following information:
(a) the site identification number provided to the permit holder by the regulator;
(b) if more than one survey of the well or facility per year is required under this section, the survey sequence number;
(c) the number of days the facility or well was pressurized during the calendar year;
(d) the date the survey was carried out;
(e) the name of the company that carried out the survey;
(f) whether the survey was a comprehensive survey or a screening survey;
(g) if the survey was a comprehensive survey, the make and model of the detection instrument used;
(h) the name, job title and business contact information, including email address and telephone number, of the individual primarily responsible for submitting the report;
(i) for each leak detected, the following:
(i) Repealed. [B.C. Reg. 256/2024, App. 1, s. 4 (n).]
(ii) the type of equipment component at which the leak was detected;
(iii) whether the leak was identified in a previous survey and not repaired;
(iv) whether the leak contained hydrogen sulphide;
(v) quantification of the leak rate in m3/hour;
(vi) the method used to quantify the leak rate;
(vii) and (viii) Repealed. [B.C. Reg. 256/2024, App. 1, s. 4 (n).]
(ix) if the leak was repaired, the date and method of repair.
(16) A permit holder must maintain, for at least 7 years from the date a leak detection and repair report is submitted, records respecting the information included in the report, including, without limitation, the following:
(a) for each individual who participated in carrying out the survey, a record of the individual's training relating to carrying out surveys under this section;
(b) a record of the repair of each leak;
(c) for each leak that was not repaired within 30 days of detection, a record of the reason for the repair timeline.
(17) Beginning on January 1, 2028, a facility permit holder must install a fixed leak monitoring device for the purpose of detecting leaks from hatches and pressure relief devices on a controlled production tank.
(18) A facility permit holder must keep records in respect of a fixed leak monitoring device on a controlled production tank including the following:
(a) a description of the device including thresholds for leak indications;
(b) the date and time of leak detection;
(c) a description of the measures taken to investigate the leak;
(d) a description of when and what actions were taken to address leak indications.
(19) A facility permit holder must repair a leak detected at a controlled production tank in accordance with subsection (12).
(20) If within 60 days of repairing a leak at a controlled production tank the facility permit holder detects a reoccurrence of the leak, the facility permit holder must report the reoccurrence of the leak to the regulator within 14 days of detection.