Drilling and Production Regulation, B.C. Reg. 282/2010

Section 37

Fracturing fluids records

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 37 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) A well permit holder must maintain detailed records of the composition of all fracturing fluids that are used in a well for which the well permit holder is responsible, including, but not limited to (a) the well authorization number, (b) the fracture date, (c) an identification of the fluid ingredients and a description of the purpose of each, (d) an identification of the ingredient concentration in the additive and in the hydraulic fracturing fluid, (e) the chemical abstract service number of each ingredient, (f) an identification of the total volume of water injected with the ingredients, and (g) the trade name and supplier of each ingredient. (2) A well permit holder must submit to the regulator the records referred to in subsection (1) within 30 days after the completion of the well.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.