Drilling and Production Regulation, B.C. Reg. 282/2010

Section 28

Surface restoration of wells and associated sites

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 28 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

Immediately after ceasing drilling or workover operations, or as soon after cessation as weather and ground conditions permit, a well permit holder must restore the ground surface of those areas of the well site and associated remote sumps and camp sites that will not be required for future operations to a state that eliminates hazards, enables control of weeds and runoff and prevents erosion.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.