Section 26

Plugging requirements for wells

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 26 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(0.1) The following persons must comply with the requirements set out in subsection (1): (a) for the purposes of section 40 (e) of the Act, a permit holder, former permit holder, authorization holder or former authorization holder with respect to a well permit under which a well has been drilled; (b) for the purposes of plugging a well, a well permit holder. (1) The requirements for the purposes of subsection (0.1) are as follows: (a) for cased wells, a notice of operations and a plugging program must be submitted to the regulator at least 7 days before commencement of operations; (b) the permit holder must plug the well in a manner that ensures (i) adequate hydraulic isolation is established between porous zones, (ii) fluids will not leak from the well, (iii) excessive pressure will not build up within any portion of the well, and (iv) the long-term integrity of the wellbore is maintained; (c) an abandonment report, in chronological format, detailing all significant operations, treatments, tests and resulting well behaviour, and including a downhole schematic diagram, must be submitted to the regulator within 30 days of the completion of abandonment operations; (d) Repealed. [B.C. Reg. 48/2021, App. 2, s. 2.] (2) For wells drilled to access usable groundwater, an official may exempt, on conditions the official considers advisable, the permit holder from a requirement under subsection (1).
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.