Drilling and Production Regulation, B.C. Reg. 282/2010

Section 19

Surface and subsurface equipment

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 19 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) The well permit holder of a completed oil or gas well must ensure that the surface and subsurface equipment of the well is arranged to permit the ready measurement of the tubing pressure, production casing pressure and surface casing pressure. (2) The well permit holder of a completed well must ensure that the surface equipment at the well site includes (a) the valve connections necessary to sample the oil, gas or water produced, and (b) in the case of a gas well, facilities for determining the wellhead fluid temperature. (2.1) The well permit holder of a cased well must ensure that the well is equipped with a wellhead, or a capping assembly, that permits access to the wellbore for pressure measurement. (3) The well permit holder of a well must keep a detailed record of all subsurface equipment in the well at all times prior to abandonment.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.