Drilling and Production Regulation, B.C. Reg. 282/2010

Section 18

Casing requirements

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 18 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) A well permit holder must ensure that casing is designed so that it will not fail if subjected to the maximum loads and service conditions that can reasonably be anticipated during the expected service life of the well. (2) A well permit holder must use non-toxic drilling fluids during the drilling of a well until, in the opinion of a qualified professional, all usable groundwater has been isolated from the drilling fluid. (3) A well permit holder must ensure that surface casing for a well conforms to the following requirements: (a) surface casing must be set in a competent formation at a depth sufficient to provide a competent anchor for blowout prevention equipment and to ensure control of anticipated well pressures; (b) the annulus must be filled with cement to the surface. (4) A well permit holder, with respect to a well drilled after this regulation came into force, must ensure that the next casing string is cemented full length if surface casing for the well is not set below usable groundwater. (5) A well permit holder must ensure that surface casing cement is not drilled out until sufficient compressive strength has been reached to allow the safe conduct of drilling operations. (6) A well permit holder must ensure that (a) all reasonable measures are taken to cement all intermediate and production casing to the surface or a minimum of 200 m above the shoe of the previous casing string, and (b) the cement is not drilled out until sufficient compressive strength has been reached to allow the safe conduct of drilling operations. (7) If there is any reason to doubt the effectiveness of casing cementation, a well permit holder must evaluate the cement integrity and ensure that remedial measures are taken if necessary. (8) On detection of a casing leak or failure, a well permit holder must (a) notify the regulator about the leak or failure without delay, and (b) repair the leak without unreasonable delay. (9) A well permit holder must ensure that a well is configured such that (a) subject to subsection (10), the surface casing annulus can freely vent, (b) excessive pressure cannot occur at the surface casing shoe, and (c) the surface casing is equipped with an open valve. (10) Subsection (9) (a) does not apply to a well if all of the following requirements are met: (a) the surface casing is cemented to the surface; (b) the surface casing is set below the base of usable groundwater; (c) the buildup pressure of the surface casing vent does not exceed 1/2 of the formation leak off pressure at the base of the surface casing; (d) the well permit holder has control of emissions through one of the following: (i) installation of a burst plate on the surface casing vent with a maximum pressure that does not exceed 1/2 of the formation leak off pressure at the base of the surface casing; (ii) flaring emissions of natural gas from the surface casing vent in accordance with sections 42 to 44; (iii) routing emissions of natural gas from the surface casing vent to hydrocarbon conservation equipment.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.