(1) A well permit holder must ensure (a) that all tools and equipment used in well operations, production, injection or disposal are installed and operated in accordance with the manufacturer's specifications or sound engineering practices, (b) that all production from or injection into a well is through tubing, except during a well operation, the production of fluids containing less than 5 mole percent of hydrogen sulphide or the injection of fresh water, and (c) that any packer set in a well is set as near as is practical above the completed interval. (2) Except during a well operation, before injecting a fluid other than fresh water or gas containing less than 5 mole percent of hydrogen sulphide into an injection or disposal well, a well permit holder must (a) set a production packer in the well as near as is practical above the injection interval, and (b) ensure that the space between tubing and the outer steel casing is filled with a corrosion and frost inhibiting fluid. (3) If a production packer is set in accordance with subsection (2), a well permit holder must (a) conduct an annual segregation test of any of the holder's wells with a production packer, and, if the test fails, complete repairs without unreasonable delay, and (b) submit a report of the annual segregation test and any repairs completed under paragraph (a) to the regulator within 30 days of completing the test.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.