Hydrogen Facility Regulation, B.C. Reg. 27/2025

Section 25

Electricity, feedstock, products and waste

Cite as Hydrogen Facility Regulation, B.C. Reg. 27/2025, s. 25 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

(1) A hydrogen facility permit holder must determine (a) the quantity of electricity used at the hydrogen facility in the manufacture of hydrogen, (b) the quantity and composition of feedstock consumed and products manufactured at the facility, and (c) the quantity of waste generated by the facility. (2) A hydrogen facility permit holder must ensure that (a) the methods used to determine quantities and composition for the purposes of subsection (1) are suitable for those purposes, and (b) measurement equipment used for the purposes of subsection (1) is (i) suitable for its purpose, (ii) calibrated properly and maintained in good operating condition, and (iii) safe from adverse weather and interference by unauthorized persons.
Read the Hydrogen Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.