Hydrogen Facility Regulation, B.C. Reg. 27/2025

Section 11

Application for hydrogen facility permit

Cite as Hydrogen Facility Regulation, B.C. Reg. 27/2025, s. 11 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

(1) An applicant for a Class 1 hydrogen facility permit or a Class 2 hydrogen facility permit must submit to the regulator an application that includes all of the following information and records respecting the proposed hydrogen facility: (a) a detailed project description; (b) a construction schedule; (c) a statement by the qualified professional of record, in the form and manner required by the regulator, that (i) identifies the code referred to in section 3 (2) (c) or (d) [adopted codes and standards] that the preliminary design of the proposed facility complies with, (ii) specifies any proposed deviations from the identified code for which an exemption under section 47 is sought, (iii) declares that the preliminary design documents, and the hazard identification studies and risk assessment studies, were completed in accordance with professional standards established under section 57 (1) of the Professional Governance Act by the Association of Professional Engineers and Geoscientists of the Province of British Columbia, (iv) specifies the studies completed, any recommendations made as a result of the studies and whether the preliminary design incorporates the recommendations, and (v) subject to section 3 (3) of this regulation and any exemption referred to in subparagraph (ii), declares that the preliminary design complies with the code identified in subparagraph (i), other codes and standards and applicable regulations. (2) In addition to the information and records required under subsection (1), an applicant for a Class 2 hydrogen facility permit must submit to the regulator the following information and records respecting the proposed hydrogen facility: (a) the preliminary design documents required by the regulator, signed and sealed by a qualified professional; (b) a report of a qualified professional, in the form and manner required by the regulator, respecting the studies referred to in subsection (1) (c) (iii); (c) a report of a qualified professional, in the form and manner required by the regulator, respecting the assessment of the potential effects of the proposed facility on the environment during construction, testing, normal and abnormal operation, upsets, suspension and decommissioning of the facility; (d) if the report under paragraph (c) identifies potential adverse effects, a report of the qualified professional, in the form and manner required by the regulator, respecting measures required to minimize the potential adverse effects of the proposed facility on the environment during construction, testing, normal and abnormal operation, upsets, suspension and decommissioning of the facility.
Read the Hydrogen Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.