Reviewable Projects Regulation, B.C. Reg. 243/2019

Section 5

Project notifications

Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 5 · last amended December 15, 2025 · read from BC Laws on November 17, 2026

The text

(1) The following categories of new projects are prescribed for the purposes of section 10 (1) of the Act: (a) projects that are designated projects under the Impact Assessment Act (Canada) and not located wholly on (i) land under the administration and control of Her Majesty in right of Canada, (ii) land the title to which is in the name of Her Majesty in right of Canada, or (iii) a reserve as defined in the Indian Act (Canada); (b) projects that would meet the following criteria thresholds, if those thresholds were reduced by 15%: (i) thresholds set out in section 4 (1) (a) and (c); (ii) production capacity thresholds set out in Parts 2 and 3; (iii) rated nameplate capacity, length, design capacity, input capacity and sulphur thresholds set out in Part 4; (iv) height, volume, area, length and rate thresholds set out in Part 5; (v) design capacity and population thresholds set out in Part 6; (vi) length, area and throughput capacity set out in Part 7; (vii) bed unit thresholds set out in Part 8; (c) projects that would result, at the peak of construction or operations, in the employment by the proponent of 250 or more employees or contractors who work more than 30 hours per week on an annual basis at the project facilities; (d) projects that emit 125 000 tonnes or more per year of one or more greenhouse gases directly from project facilities, measured in carbon dioxide equivalents, determined in accordance with Part 3 of the Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015; (e) transmission lines that are greater than 230 kV and greater than 40 km in length; (f) project that include the clearance of (i) 40 km in length or more of land that is to be developed for a transmission line, transmission pipeline, railway, public highway or resource road, if the land is not alongside and contiguous to an area of land previously developed for one of those purposes, or (ii) 450 ha or more of land, unless the clearance has been authorized by the minister, or delegate, under the Resort Timber Administration Act. (2) Subsection (1) (f) does not apply to the following project categories in Column 1 of the applicable tables: (a) transmission lines; (b) transmission pipelines; (c) public highways; (d) railways. (3) Subject to subsection (4), an existing project, as modified, that emits 125 000 tonnes or more per year of one or more greenhouse gases directly from project facilities, measured in carbon dioxide equivalents, determined in accordance with the Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015, is prescribed for the purposes of section 10 (1) of the Act. (4) An existing project, as modified, that meets the criterion set out in subsection (3) and for which a project notification has previously been submitted under that subsection is not prescribed for the purposes of section 10 (1) of the Act. (5) The period prescribed for the purposes of section 10 (1) of the Act is the period ending (a) 15 days after a proponent of a project referred to in the table in the Appendix to the Reviewable Projects Transition Regulation first submits, after the date this section comes into force, an application for an applicable approval set out in the table, or, (b) if the proponent has made, before the date this section comes into force, all applications for applicable approvals set out in the table, but no approvals have been obtained by the date this section comes into force, 90 days after the date this section comes into force. (6) The chief executive assessment officer must notify the minister on receiving a notice under subsection (1) (d) or (3).
Read the Reviewable Projects Regulation on BC Laws ↗

Made under Environmental Assessment Act, SBC 2018, c. 51.