Building Envelope Renovation Regulation, B.C. Reg. 240/2000
Section 20
Mitigation of damage by holder
Cite as Building Envelope Renovation Regulation, B.C. Reg. 240/2000, s. 20 · last amended March 6, 2024 · read from BC Laws on November 17, 2026
The text
(1) The warranty provider of a materials and labour warranty or a water penetration warranty may require a holder to mitigate any damage caused by defects in materials or labour or by water penetration, as set out in the materials and labour warranty or water penetration warranty.
(2) Subject to subsection (3), for defects covered by a materials and labour warranty or water penetration warranty, the duty of the holder to mitigate is met through timely notice in writing to the warranty provider.
(3) The holder must take all reasonable steps to limit the damage to the residential building if the defect requires immediate attention.
(4) To the extent that damage to the building envelope of a residential building is caused or made worse by the failure of a holder to take reasonable steps to mitigate as set out in this section, such damage may, at the option of the warranty provider, be excluded from the materials and labour warranty or water penetration warranty, as applicable.
Read the Building Envelope Renovation Regulation on BC Laws ↗
Made under Homeowner Protection Act, SBC 1998, c. 31.