Building Envelope Renovation Regulation, B.C. Reg. 240/2000
Section 19
Holder to give warranty provider notice of defects
Cite as Building Envelope Renovation Regulation, B.C. Reg. 240/2000, s. 19 · last amended March 6, 2024 · read from BC Laws on November 17, 2026
The text
(1) Within a reasonable time after the discovery of a defect covered by a materials and labour warranty or a water penetration warranty, and before the expiry of the coverage of that materials and labour warranty or water penetration warranty, a holder must give the warranty provider and the building envelope renovator written notice of that defect which includes particulars of the defect in reasonable detail.
(2) The warranty provider may require that the notice under subsection (1) include
(a) the materials and labour warranty or water penetration warranty number, and
(b) copies of any relevant documentation and correspondence between the holder and the building envelope renovator.
Read the Building Envelope Renovation Regulation on BC Laws ↗
Made under Homeowner Protection Act, SBC 1998, c. 31.