Asphalt Plant Regulation, B.C. Reg. 217/97
Section 12
Requirements for handling of material collected by emission controls
Cite as Asphalt Plant Regulation, B.C. Reg. 217/97, s. 12 · last amended October 28, 2019 · read from BC Laws on November 17, 2026
The text
(1) Particulates collected using emission control equipment must be contained so that there is no release of particulates into the atmosphere.
(2) A hot mix asphalt plant which uses water to remove contaminants before discharge
(a) must not discharge effluent directly to a stream,
(b) must direct effluent to a settling pond, or to a treatment works approved by a director, and
(c) must, when a settling pond is decommissioned or drained, ensure that
(i) the liquid is not allowed to enter a stream or is not discharged in a location where it could reasonably be expected to enter a stream,
(ii) the concentration of total extractable hydrocarbons does not exceed 20 milligrams per litre in the liquid released, and
(iii) settled materials which remain after the liquid has been drained are managed so that they are not released into the atmosphere.
(3) The director may impose additional conditions regarding the handling of material collected by the emission control equipment.
Read the Asphalt Plant Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.