Forest Planning and Practices Regulation, B.C. Reg. 14/2004
Section 36
Permanent access structure limits
Cite as Forest Planning and Practices Regulation, B.C. Reg. 14/2004, s. 36 · last amended January 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) An agreement holder must ensure that the area in a cutblock that is occupied by permanent access structures built by the holder or used by the holder does not exceed 7% of the cutblock, unless
(a) there is no other practicable option on that cutblock, having regard to
(i) the size, topography and engineering constraints of the cutblock,
(ii) in the case of a road, the safety of road users, or
(iii) the requirement in selection harvesting systems for excavated or bladed trails or other logging trails, or
(b) additional permanent access structures are necessary to provide access beyond the cutblock.
(2) If an agreement holder exceeds the limit for permanent access structures described in subsection (1) for either of the reasons set out in that subsection, the holder must ensure that the limit is exceeded as little as practicable.
(3) An agreement holder may rehabilitate an area occupied by permanent access structures in one of the following ways:
(a) in accordance with the results or strategies specified in the forest stewardship plan;
(b) in accordance with the planning guideline requirements, substituted requirements or additional measures specified in the forest operations plan;
(c) under subsection (3.1).
(3.1) An agreement holder may rehabilitate an area occupied by permanent access structures by
(a) removing or redistributing woody materials that are exposed on the surface of the area and are concentrating subsurface moisture, as necessary to limit the concentration of subsurface moisture on the area,
(b) de-compacting compacted soils, and
(c) returning displaced surface soils, retrievable side-cast and berm materials.
(4) If an agreement holder rehabilitates an area under subsection (3.1) (a) and erosion of exposed soil from the area would cause sediment to enter a stream, wetland or lake, or a material adverse effect in relation to one or more of the subjects listed in section 149 (1) of the Act, the agreement holder, unless placing debris or revegetation would not materially reduce the likelihood of erosion, must
(a) place woody debris on the exposed soils, or
(b) revegetate the exposed mineral soils.
Read the Forest Planning and Practices Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.