Liquefied Natural Gas Facility Regulation, B.C. Reg. 146/2014

Section 2

Applications for LNG facility permit

Cite as Liquefied Natural Gas Facility Regulation, B.C. Reg. 146/2014, s. 2 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

An application for an LNG facility permit must include all of the following information respecting a proposed LNG facility: (a) a detailed project description; (b) a preliminary construction schedule; (c) if the applicant intends to construct a modular unit outside British Columbia, plans respecting the use of third party validation and verification services; (d) preliminary plot plans; (e) process flow diagrams; (f) flaring, venting and relief system design basis; (g) design and safety studies respecting the siting of the proposed LNG facility and all of its equipment; (h) if the applicant intends to rely on a quantitative risk assessment in accordance with section 4 (4), the results of a preliminary quantitative risk assessment based on (i) preliminary engineering design information, or (ii) an operating LNG facility of liquefaction capacity similar to that of the proposed LNG facility; (i) the results of hazard identification studies, including studies of both process hazards and natural hazards. (j) Repealed. [B.C. Reg. 48/2021, App. 3, s. 1.]
Read the Liquefied Natural Gas Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.