Geophysical Exploration Regulation, B.C. Reg. 280/2010

Schedule 2

Schedule 2

Cite as Geophysical Exploration Regulation, B.C. Reg. 280/2010, Schedule 2 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

Schedule 2 Reduced Buffer Distances [section 4 (3)] 1 Structure 2 Non-explosive energy source (metres) 3 Explosive energy source Charge weight (kg) Distance (metres) Residence, barn, building or structure with a concrete base, concrete irrigation structure, concrete lined irrigation canal, concrete water pipeline, artificial water hole, developed spring or piezometer 50 >0 ≤ 2 >2 ≤ 4 >4 ≤ 6 >6 ≤ 8 >8 ≤ 10 >10 ≤ 12 64 90 110 128 142 156
Read the Geophysical Exploration Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.