Geophysical Exploration Regulation, B.C. Reg. 280/2010
Section 2
Reports
Cite as Geophysical Exploration Regulation, B.C. Reg. 280/2010, s. 2 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) A geophysical permit holder must submit a geophysical project report
(a) at weekly intervals on each Monday following the date of commencement while the project is in progress, and
(b) on the date of completion.
(2) A geophysical project report must include all of the following information:
(a) contact information for the project field manager;
(b) the current location of the headquarters of the crew conducting operations;
(c) details of the progress of the project, including details with respect to access and cutline construction operations, drilling operations and data-acquisition operations;
(d) the date of an intended shutdown and the date operations will resume, if the shutdown is to be for a duration longer than 5 days;
(e) if the project involves the drilling of holes, the location of any holes that released any gas or water and a description of the actions taken to stop the release and remedy any damage caused by the release;
(f) if the project involves the use of explosive charges, the location of any misfired charges and a description of action taken to deal with the misfire in accordance with section 7.
(3) An official may grant to a geophysical permit holder a written exemption from all or part of subsection (2) if the official is satisfied the project does not involve
(a) the drilling of holes and the use of explosive charges, or
(b) the construction of new access or new cutlines.
(4) A geophysical permit holder must file a final plan with the regulator within 60 days after the date of completion.
(5) An official may grant to a geophysical permit holder a written exemption from subsection (4) if the official is satisfied that the project does not involve
(a) the drilling of holes and the use of explosive charges, or
(b) the construction of new access or new cutlines.
(6) The final plan must include all of the following:
(a) a base map that has a scale of 1:50 000, clearly identifies the survey system as the National Topographic Series or Township and Range and shows all of the following information:
(i) the location of roads, trails and cutlines that were used to gain access;
(ii) the location of existing cutlines that were used to acquire data;
(iii) the location of new cutlines that were cut to acquire data;
(iv) the location of detours constructed for exploration equipment, and the length and width of the detours, in metres;
(v) the location and size of campsites, helipads and landing strips constructed or used;
(vi) the location of stream crossings;
(vii) the location of each misfired charge and each hole that flowed gas or water;
(viii) the total length in kilometres of all existing cutlines that were used to acquire data;
(ix) the total length in kilometres and width in metres of all new cutlines that were cut to acquire data;
(x) the total length in kilometres and width in metres of all new cutlines that were cut to gain access;
(b) a final plan cover sheet.
(7) If an official considers it appropriate in the circumstances, the official may grant to a geophysical permit holder a written exemption from one or more of subparagraphs (i) to (x) of subsection (6) (a).
(8) If the project involves the drilling of shot holes, the permit holder must maintain a map showing the location and identifying number of each shot hole and, when requested by an official, submit the map to the regulator.