Geophysical Exploration Regulation, B.C. Reg. 280/2010

Section 1

Interpretation

Cite as Geophysical Exploration Regulation, B.C. Reg. 280/2010, s. 1 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

In this regulation, unless the context otherwise requires: “Act” means the Energy Resource Activities Act; “artificial water hole” means an artificial opening in the ground made for the purpose of (a) exploring for, or extracting and using, ground water, (b) testing or measuring ground water, (c) recharging or dewatering an aquifer, (d) ground water remediation, or (e) use as a monitoring well; “cutline” means a cutline made by hand or machine in the course of geophysical exploration; “date of commencement” means, in relation to a project, the date on which the geophysical permit holder (a) disturbs the ground or vegetation to establish access, the shot points or the receiver points to be used in a cutline, or (b) mobilizes personnel or equipment on the project site, whichever happens first; “date of completion” means, in relation to a project, the date on which (a) the acquisition of geophysical data is completed, or (b) the permit for the project expires, whichever happens first; “developed spring” means a local groundwater discharge that, as a result of human intervention, is usable for long-term domestic or non-domestic purposes; “geophysical permit” means a permit that includes permission to carry out geophysical exploration; “geophysical permit holder” means a permit holder of a geophysical permit; “misfired charge” means explosive material that fails, on initiation, to completely detonate or to function in accordance with the manufacturer's specifications; “monitoring well” means a well that (a) is used or intended to be used for the purpose of ongoing monitoring, observing, testing, measuring or assessing (i) the level, quantity or quality of ground water, or (ii) subsurface conditions, including geophysical conditions, and (b) is not used or intended to be used for the purpose of (i) exploring for or extracting ground water for use, or (ii) injecting water or any other substance into ground water on an ongoing basis; “monument” means (a) any coordinate control monument or original monument, as defined in section 11 of the Land Survey Act, or (b) any geodetic control monument, as defined in the Association of British Columbia Land Surveyors' General Survey Instruction Rules, as amended from time to time, together with any ancillary reference mark such as an azimuth bar, bearing tree, cairn, mound, pit, trench, tripod or tower, which has been established to mark the boundary of a parcel of land, right of way, well, triangulation station or boundary of British Columbia; “project” means a program of geophysical exploration for which a geophysical permit has been issued under the Act; “project number” means the number assigned to each project by the regulator for identification purposes; “residence” means a structure used as a permanent or temporary dwelling, and includes a cabin but does not include a tent or other mobile structures; “shot hole” means a hole drilled for the purpose of inserting an explosive charge to be used as an energy source in geophysical operations; “shot point” means the location of the energy source used in geophysical operations.
Read the Geophysical Exploration Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.