Dormancy and Shutdown Regulation, B.C. Reg. 112/2019

Section 7

Assessment

Cite as Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, s. 7 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

A dormant site or former site is assessed for the purposes of this regulation if the permit holder for the site (a) has the following assessment carried out by or under the supervision of a qualified professional: (i) both stages of a preliminary site investigation described in section 58 (1) (a) and (b) [preliminary site investigations] of the Contaminated Sites Regulation; (ii) unless the preliminary site investigation shows that the site meets the numerical standards under section 17 [numerical standards] of the Contaminated Sites Regulation, a detailed site investigation described in section 59 (1) and (2) [detailed site investigations] of that regulation, (b) submits to the regulator a report that (i) describes the assessment carried out, (ii) includes the following: (A) the information required to be included in a report under section 58 (5) (c) and (d) of the Contaminated Sites Regulation; (B) if a detailed site investigation is required under paragraph (a) (ii) of this section, the information required to be included in a report under section 59 (3) of the Contaminated Sites Regulation; (C) any other information required by the regulator; (D) any signed statement, of the qualified professional referred to in paragraph (a) or the permit holder, required by the regulator, and (iii) is in the form specified by the regulator, (c) takes the actions identified in paragraphs (a) and (b) in relation to all facilities and other equipment that are associated with an energy resource activity permitted by the well permit or the facility permit, as the case may be, and (d) in the case of a dormant site or a former site that includes a pipeline right of way, does the following: (i) ensures that all areas of potential environmental concern associated with the pipeline are identified and investigated by a qualified professional; (ii) submits an investigation report to the regulator, which report must be in the form specified by the regulator.
Read the Dormancy and Shutdown Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.