Dormancy and Shutdown Regulation, B.C. Reg. 112/2019
Section 6
Decommissioning
Cite as Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, s. 6 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
A dormant site or a former site is decommissioned for the purposes of this regulation if the permit holder for the site
(a) does the following, as applicable:
(i) if the site is or was the operating area for a well permit, complies with the applicable requirements in section 26 (1) (a) to (c) [plugging requirements for wells] of the Drilling and Production Regulation;
(ii) if the site is or was the operating area for a facility permit, complies with the applicable requirements in section 79 [obligations on cancellation or cessation of operations] of the Drilling and Production Regulation;
(iii) if the site is or was the operating area for a pipeline permit, complies with the applicable requirements in section 11 [obligations on cancellation or cessation of operations] of the Pipeline Regulation,
(b) removes from the site any facilities and other equipment that are associated with an energy resource activity that is permitted by the permit, and
(c) removes from the site any facilities and other equipment that are associated with a related activity of an energy resource activity that is permitted by the permit.
Read the Dormancy and Shutdown Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.