Dormancy and Shutdown Regulation, B.C. Reg. 112/2019
Section 22.1
Substitution of sites under liability reduction plans
Cite as Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, s. 22.1 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
(1) In this section:
“eligible permit holder” means a permit holder who has
(a) an approved liability reduction plan, and
(b) a portfolio of current sites or a portfolio of former sites and the portfolios, alone or together, include a tier 1 qualifying site count or a tier 2 qualifying site count;
“eligible site” means a site other than a dormant site or former site;
“relevant geographic area” means a geographic area determined by the regulator after engaging with a local first nation identified for a site within the geographic area;
“specified work” includes work to decommission, assess or restore an eligible site as if those terms applied in relation to the eligible site.
(2) If an eligible permit holder wishes to do specified work on one or more eligible sites instead of on one or more dormant sites or former sites covered by the permit holder's liability reduction plan, the eligible permit holder must do the following:
(a) if the affected dormant sites or former sites are located outside a relevant geographic area,
(i) notify the land owners of the affected dormant sites or former sites that specified work in relation to those sites may be deferred, and
(ii) prepare and maintain a record of that notification and any response received from the land owners;
(b) give the regulator a written notice that
(i) identifies the affected eligible sites, dormant sites and former sites, and
(ii) if applicable, is accompanied by the record referred to in paragraph (a) (ii).
(3) If, after receiving a notice under subsection (2) (b) from an eligible permit holder, the regulator approves the permit holder's proposed substitution and the permit holder does specified work on one or more eligible sites,
(a) the time by which the permit holder must, under section 22 (3) (a) to (e), restore the dormant sites or former sites identified in the notice is extended by a period of up to 5 years, as determined by an official, and
(b) if the regulator is satisfied that the specified work on the eligible sites has been done, the specified work may be considered for the purposes of section 22 (7) (a) as if the eligible sites are dormant sites or former sites.
(4) Subsection (3) does not apply if a dormant site or former site in respect of which restoration timelines would be extended is a priority site or located within a relevant geographic area.
Read the Dormancy and Shutdown Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.