Dormancy and Shutdown Regulation, B.C. Reg. 112/2019

Section 22

Basic requirements

Cite as Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, s. 22 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

(1) A liability reduction plan of a permit holder must identify all of the following, as applicable: (a) the dormant sites and former sites that are covered by the plan on the date the permit holder submits the plan to the regulator; (b) the sites the permit holder anticipates will become dormant sites or former sites during the period covered by the plan but after the plan is approved; (c) the dormant sites for which the permit holder anticipates acquiring the permit during the period covered by the plan but after the plan is approved; (d) the circumstances in which sites referred to in paragraph (b) will become dormant sites or former sites; (e) the circumstances in which the permit holder will acquire the permits for the dormant sites referred to in paragraph (c). (2) A liability reduction plan must (a) cover a period of no more than 15 calendar years, (b) for each of those calendar years, specify (i) the number of dormant sites and former sites covered by the plan to be decommissioned in the calendar year, (ii) the number of dormant sites and former sites covered by the plan to be assessed in the calendar year, and (iii) the number of dormant sites and former sites covered by the plan to be restored in the calendar year, and (c) be in the form specified by the regulator. (3) A liability reduction plan must be consistent with the following timelines for the restoration of the dormant sites and former sites covered by the plan: (a) in the case of a type A or type B site that is included in a tier 1 qualifying site count, by December 31, 2036; (b) in the case of a type C site that is included in a tier 1 qualifying site count, by December 31 of the calendar year that is 10 calendar years after the reference year for the site; (c) in the case of a type A or type B site that is included in a tier 2 qualifying site count, by December 31, 2041; (d) in the case of a type C site that is included in a tier 2 qualifying site count and will become a dormant site before January 1, 2032, by December 31, 2041; (e) in the case of a type C site that is included in a tier 2 qualifying site count and will become a dormant site on or after January 1, 2032, by December 31 of the calendar year that is 10 years after the reference year for the site. (4) A liability reduction plan must include specific plans for the decommissioning, assessment and restoration of the following: (a) priority sites; (b) dormant sites and former sites within a relevant geographic area, as defined in section 22.1. (5) If, in relation to a liability reduction plan, a permit holder has made a commitment to a local first nation, if any, identified for a dormant site or former site covered by the plan, the commitment must be included in the plan. (6) A liability reduction plan must specify, for each type of dormant site that is covered by the plan, the maximum number of dormant sites of that type for which the permit holder may transfer the permit. (7) A liability reduction plan must demonstrate that the permit holder will, in each calendar year covered by the plan, decommission, assess and restore a number of dormant sites or former sites sufficient to (a) reduce the permit holder's portfolio of current sites or portfolio of former sites, or both, within the calendar year, and (b) comply with the timelines for restoration set out in subsection (3).
Read the Dormancy and Shutdown Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.