The text

(1) The fire hydrant system referred to in section 24 and a water deluge system referred to in section 25 may be connected to the same water main and main pump systems. (2) Every water main referred to in section 24 or 25 shall (a) be routed clear of hazardous areas as far as practicable; (b) be arranged in relation to any thermal barriers and structural elements of the installation so as to obtain the maximum protection from damage due to heat; (c) be equipped with valves that will permit a damaged part of the system to be isolated from the undamaged parts; and (d) be used solely for the purpose of firefighting. (3) Every sea suction and source of power for each of the pump systems referred to in section 24 or 25 shall (a) be designed and arranged to start automatically in response to (i) any drop in water pressure that indicates a demand on the system, (ii) the receipt of a signal from the fire detection system, and (iii) the receipt of a signal from any manual control point; (b) be capable of being started manually from the control station and started and stopped manually from a location close to the pump system; (c) be capable of functioning continuously without attendance for at least 24 hours; and (d) be designed and arranged so that a fire, explosion or flooding in any one space of the installation will not put more than one pump system out of operation. (4) When any of the pump systems referred to in section 24 or 25 is started, an audible alarm shall be given automatically at the pump and an audible and visual alarm shall be given automatically at the fire and gas indicator panel in the control station. (5) Every pump system provided pursuant to section 24 or 25 shall be located in a part of the installation remote from spaces that contain equipment used for storing, conveying or processing petroleum that is not used as fuel on the installation.
Read the Canada Oil and Gas Installations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.