Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117
Section 18
Cite as Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117, s. 18 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Every operator who is conducting an onshore geophysical operation shall, when charges are being prepared, ensure that
(a) no tools other than tools made of bronze or another non-sparking material are used to cut or pierce a cartridge;
(b) there is no stripping of cartridges;
(c) priming is done only at the blasting site and all explosives, other than the charge to be loaded into the shot hole, are kept inside a magazine until the primed cartridge is loaded into the shot hole;
(d) no detonating cord is capped and no cartridge is primed in any place where explosives are stored; and
(e) the detonating cord is handled in a manner that prevents bending or pinching of the cord.
(2) Every operator who is conducting an onshore geophysical operation shall ensure that all the electric detonators used in a circuit are of the same design and made by the same manufacturer.
Read the Canada Oil and Gas Geophysical Operations Regulations on the Justice Laws Website ↗
Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.