Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26

Section 70

Formation leak-off or integrity test

Cite as Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26, s. 70 · current to September 21, 2026 · regulation last amended September 17, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) An operator must ensure that a formation leak-off test or a formation integrity test is conducted (a) before drilling more than 10 m of new formation below the shoe of any casing other than the conductor casing; and (b) before drilling more than 10 m when sidetracking from the previous casing string. (2) The formation leak-off test or formation integrity test must be conducted at a pressure that allows for safe drilling to the next casing depth and for the adequacy of the cement at the level of the shoe to be verified before drilling ahead.
Read the Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations on the Justice Laws Website ↗

Made under Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, S.C. 1988, c. 28.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.